How long does it take to design and manufacture a production line?

2026-08-07

For standard production lines, SINOFUDE's manufacturing lead time is approximately 60 days, with on-site installation typically taking 5–7 days. Customized projects require additional days for design, with total timeline varying based on line complexity and configuration.